"Architectural
Spec-Speak". Sixteen Ways to Understand your Architect. Part 1
By Ted Sottong,
AIA, who is a principal in the firm of Noelker & Hull Associates,
Inc.
In the beginning
of time, architects frantically scribbled notes all over their drawings
to make sure they got what they wanted. They ran out to sites and waved
their arms wildly describing their intentions, picking through the construction
site to make sure the materials were the right quality. It was chaos.
Then, in 1948, came CSI. The Construction Specifications Institute specialized
in writing specifications in conjunction with drawings. They categorized
all building materials into sixteen categories, bringing peace and harmony
to the universe once again.
Your architect
is likely thinking in terms of these sixteen divisions, and using language
specific to these divisions. As an individual who works with Architects
from time to time, here is a 16-part glimpse into your architects
mind, which will assist you during those new construction, building or
renovation meetings.
Since the
exploration of the mind can be an extensive process, were spitting
the "mind" in two, so to speak. Check back in two weeks for
a continuation of this article.
To help
you sift through the brain, Ive placed in bold key definitions/concepts
that I think you need to know. Also included in this article are my opinions
and tips on important things you need to consider as a member of a new
construction/renovation team.
Division 1 - General
Conditions
When involved
in new construction or renovation, the first part of your specifications
includes information for the contractor regarding what is expected of
her in preparing the bid or price for your project. It also may include
the contract or other contractual information she will be expected to
sign if she gets the job. This information, along with Division 1 of the
specifications, is commonly called the "front end". Division
1, General Conditions or General Requirements tells the contractor what,
in addition to the site work and building project, will be expected of
him. Information on temporary facilities (portable toilets, heat, signage),
allowances (lump sum amounts to be added to the contract to cover usually
unknown conditions or materials), alternates (parts of the project to
potentially be either added or deleted, and therefore bid separately),
general quality requirements, and testing requirements to assure quality,
is outlined along with other requirements.
Jobsite
safety is completely the responsibility of the contractor. Neither the
owner nor the architect is in a position to supervise the site in such
a way. In fact, architects simply observe to avoid becoming involved in
duties outside their purview, not to mention area of expertise.
The submittal
procedure is also described. Submittals, called shop drawings when
there is a graphic portion of the submittal, are interpretations of the
contract documents by the contractor. The process should work like
this:
- The contractor hires a subcontractor, for example a cabinetmaker.
The cabinetmaker will being fabricating and installing the casework
(cabinetry) in your building.
- The cabinetmaker takes the architectural drawings and produces shop
drawings showing the casework elevations (front on drawings)
and details showing the construction. If he is using pre-manufactured
units, he acquires information from the manufacturer showing the quality
of construction. Also, he will send cut-sheets (manufacturer information)
on the drawer pulls, door handles, hinges, etc. The cabinetmaker takes
all this information and sends it to the contractor.
- The
contractor checks this information, and if it is compliant with the
specifications and drawings, sends them to the architect.
- The
architect checks the submittal, and if approved, sends them back to
contractor for fabrication. If the submittal is not correct, the architect
asks for corrections or a re-submittal.
This is
the last chance for you and your architect to catch any mistakes, and
it is not unusual for owners to participate in this process on certain
important items. If youd like to review the caulking submittal,
you can, but your time may be better spent perusing the casework shops.
Division 2 - Site
Work
Your site
is your biggest unknown. A geotechnical survey can help you improve your
odds. A geotechnical survey will, based on soil borings, tell your
structural engineer how to design the buildings footings based on
the compressive strength of the soil. It may also identify subsurface
conditions you need to know about rock, large cavities, underground
rivers, and families of gophers. It is not unheard of for an appropriate
number of borings to be taken, analyzed, and not reveal serious conditions
that youll wish you knew about. Its not possible (nor, more
importantly, is it fair) to have your architect or contractor pay for
these problems. You can lock in pricing at the time of bidding for adding
or removing additional soil should the need arise.
Trenching
and footings, demolition, utility work, trees, paving, curbs, and those
pebbly trashcans with sand in top are all part of site work. Footers
are not the same as footings, by the way. "Footer" in this context
is not a word at all, and since it is commonly used, will allow you plenty
of opportunity to chuckle quietly to yourself.
Division 3
Concrete
Concrete
is made by combining Portland cement, aggregate (fine and course rock),
and water. Concrete is therefore not cement. Additives to concrete
are common, and can change its color, make it cure (harden) slower
or faster, or make it stronger. It can be poured and stamped to look like
pavers, usually in conjunction with color additives.
Most
concrete is reinforced these days. This increases its tensile strength,
which essentially means that it will be less likely to crack and fail.
Rebar, or reinforcing bar, is used for this. Rebar is steel, and to keep
it from rusting, you need enough coverage. Coverage is the amount of concrete
over the rebar to protect it from the elements.
Precast
concrete is concrete poured into forms off-site at a plant.
Its environment is controlled and the forms the concrete is poured into
can be vibrated to virtually eliminate air bubbles. Poured-in-place
concrete, conversely is poured on site and can look a little rougher.
Division 4
Masonry
If you can
stack it up, it will probably be covered in the masonry section. In fact,
glass block is specified here, not under division 8 Doors and Windows,
where other glass is found. The most common masonry products are brick
and CMU (concrete masonry units), which is often called concrete block.
CMU is concrete poured into forms and steamed cured. This gray colored
block is sometimes called cinder block. Cinder block is actually concrete
block with cinders used as the aggregate. This is not the type of
block commonly used in construction today. CMU comes in a variety of colors
and textures and has gained popularity in some locations as a substitute
for brick.
Block
and brick is often combined into cavity wall construction. The concrete
block of a cavity wall is often called "back-up", or the "bearing
wythe", a wythe being a layer of a wall. It is bearing when the weight
of the structure sits on it. It does all the work. The cavity of
the cavity wall is made up of air, one of natures best insulators,
and is partially filled with rigid insulation, because man doesnt
trust nature. Finally, the outside wythe is the brick, or face brick.
The brick is tied to the back-up with ties. These ties need to be of good
quality and installed well, because, at 4" thick and a whole building
high, it doesnt do very well on its own. It is just a veneer, or
decorative face on your building and supports only its own weight.
Stone and
mortar are also covered in Division 4.
Division 5
Metals
Everything
from structural steel to pipe bollards and handrails is covered in Division
5. Structural steel forms the steel frame of your structure. I-beams
have all but given way to wide flange beams, which are more H shaped.
The flange the top and bottom of the I - are simply wider. Tube
steel is also common, and is usually in the form of round tubes or square
tubes. A 4" round tube is so efficient, it could easily hold your
house up all by itself, if it only had better balance. Of course, I havent
seen your house; so dont hold me to this.
A pipe
bollard is concrete-filled tube steel that sticks up out of the ground
to about belly-button height. Bollards are excellent for allowing
foot traffic while stopping vehicular traffic. Bollards can be made of
other materials too, but decorative bollards are usually primarily a visual
barrier to complement or replace a curb. They would probably not withstand
a car driving over it, but neither does a curb. Bollards provide a nice
high visual barrier to law-biding motorists.
Division 6 - Wood
and Plastics
"Just
one word, my boy. Plastics. Theres a great future in plastics."
Mr. McGuire, who made this famous advice to Dustin Hoffman in The Graduate
would have been proud to see plastics listed with wood. This seemingly
odd pairing makes more sense when you consider the frequent use of P-lam
(plastic laminate) with wood cabinets. Or the ease with which wood
can be faked with plastic. Its a shame, but plastic is in some cases
more efficient than wood, but nothing can match the warmth and texture
of real wood.
Wood, like
so many of us, is strong but imperfect. The imperfections in wood compromise
its strength and limit its use. In order to make it stronger, it can be
cut into slivers, inspected for these imperfections, and the best pieces
saved. The pieces are then glued back together with very strong glue to
make glue-lam member. Glue laminated members have the advantage of the
strongest qualities of wood, the look of wood, and a limit on length based
only on practicality.
Rough
carpentry, like the wood 2x4 studs in your walls, as well as architectural
millwork, like moldings around your doors and ceilings, are all included
in Division 6.
Division 7
Thermal and Moisture Protection
Heres
where youll find your roof. Owners care an awful lot about roof
systems, and not just because its holding the walls down. Any roof
that keeps the water off your head is a success, but there are some other
important things to consider. Your roof needs to be ventilated. The space
under your roof material needs to breath to keep it from getting too hot.
Good ventilation will also prevent your roof space from getting too warm
in the winter, melting the snow on your roof, and turning it to ice.
To allow
ventilation, your architect may use louvers, ridge vents, and ventilated
soffit. The soffit is the underside of the roof overhang, and it
is important that the insulation on the inside not block the ventilation
in the soffit. This important detail should be checked on the drawings
as well as in the field to assure good ventilation.
Division
7 also includes waterproofing systems, insulation, flashing (membrane
installed in the wall to allow moisture to exit the wall), and caulking.
Division 8 - Doors
and Windows
Would you
let anyone fenestrate your building? You do when you let your architect
put openings in it. Fenestrations are usually window openings and,
if your architect uses this word, he is eager to impress you. Dont
be. Anyone can do it. Windows, doors, glass and glazing are all covered
in this division.
Skylights
are also covered. A skylight is a hole in your roof. Sure, this
might sound like a good idea, but it can be a problem if not detailed
well. Truthfully, skylights have come a long way, but there are other
ways to bring in light from above. A clerestory is a raised portion
of a roof to let light in. Windows at the perimeter of a clerestory
are installed vertically, just like the one over your kitchen sink. Thats
a detail we know works. And if someone offers you a roof window, dont
be fooled. Its a sloped-roof skylight you can open.
Door hardware
is also part of Division 8. Lots of terminology gets thrown around here,
leaving plenty of room for confusion. For example, the hinges on your
doors may be call butt hinges. In fact you may just get a pair of butts
for your door. Similarly, flush bolts are not misfiled from the plumbing
section; it a bolt that goes into a hole in the floor. "Panic hardware"
may be a term you hear, which, while sounding somewhat alarmist, is a
marked improvement over the "crash bar" of which it is comprised.
This type of hardware, allowing exit even when the door is locked from
the other side, is now called "exit hardware," which has calmed
us all down considerably.
Closing for Part
1:
Congratulations!
Youre half way through the brain of your architect. Check back in
two weeks and well continue this fascinating tour!
About the Author
Ted Sottong,
AIA is a principal in the firm of Noelker & Hull Associates, Inc.
in Chambersburg, PA. Ted is not a member of CSI, though he is kept in
line by several of his colleagues who are.